Bridges

Disraeli Pedestrian Bridge Bearing Reset

Edwards Creek Drain

PTH 1 over the Whitemouth River

Fermor Street Bridge Repair

Birch River Bridge Erection

Baie St. Paul Bridge Repair
-
Fermor Street Bridge Repair
Scope: Bridge Repair
Prairie Iron Was hired to chip loose concrete off of existing bridge piers over the CN Symington Yards and then wrap the piers in a protective mesh to prevent any concrete from falling in the future.
Customer: Manitoba Infrastructure and Transportation -
Baie St. Paul Bridge Repair
Scope: Emergency Repair
After and Impact Left 2 columns and multiple bottom Chords Damagaed Prairie Iron’s Emergency Repair Services were used to repair and strengthen the damaged columns and severley Damaged bottom chords. The remaining chords and columns were strengthed/ replaced at a later date once the bridge was open to traffic.
Customer: Manitoba Infrastructure and Transportation

Louise Bridge Expansion Joint Repair

Hodgson Bridge Repair

Gainsborough Creek Acrow Launch and Bridge Erection
-
Louise Bridge Expansion Joint Repair
Scope Expansion Joint Repair
Prairie Iron was contacted to repair a damaged expansion joint on the Louise Bridge. Work consisted of removing the damaged plate, site fabbing and installing a new plate during a routine maintenance shutdown.
Customer: City of Winnipeg Public Works Department -
Gainsborough Creek Acrow Launch and Bridge Erection
Scope: Acrow Launching & Bridge Erection
Prairie Iron provided manpower and Jacking Services for the lauching of a 50 Meter Acrow Bridge. We were also provided erection services to install 15 bridge girders on the new permanent Bridge over the Gainsborough Creek on PTH 83.
General Contractor: PCL

Hartney Acrow De-Launch

GWWD Rail Bridge

Graham Creek Bridge Erection
-
Hartney Acrow De-Launch
Scope: Acrow De-Launching
Prairie Iron provided fabricaton, manpower and Jacking Services for the De-Launching of a 100 meter Acrow Bridge over the Souris River on PTH 21. The required pedestals and Jacking Beams were fabricated in shop by prairie Iron Erectors.
General Contractor: PCL

Pinawa Bridge Rehab - Additional Cover Plating

Morris Bridge Rehab

Magnet Bridge Repair
-
Pinawa Bridge Rehab - Additional Cover Plating
Scope: Bridge Rehabilitation
Prairie Iron was contacted to provide the installation of additional coverplating to strengthen the girder web and flanges.
Steel Fabricator: Shopost Iron Works 1989 Ltd
General Contractor: Gateway construction and Engineering -
Morris Bridge Rehab
Scope: Bridge Rehabilitation
Prairie Iron provided steel installation services as well as our bridge Jacking Services for the Morris Bridge Rehabilitation on PTH 23 over the Red River. Our scope of work consisted of installing and bolting various steel girder strengthening components ranging from cover plating to new horizontal and verticle angle stiffiners. The job required the hoisting and installation of 65,000KG of girder strengthening material, field drilling and installation of 26,000 bolts, field welding 11,000 nelson studs. Our jacking services were provided to reset and clean bearings at required locations.
Steel Fabricator: Shopost Iron Works 1989 LTD
General Contractor: M.D. Steele Construction Ltd -
Magnet Bridge Repair
Scope: Bridge Jacking and Leveling
Prairie Irons Bridge Jacking and Levelling Services were used to bring pile caps back to proper elevation. We were also tasked with splicing and re-welding the piles back into proper alignment.
Customer: Manitoba Infrastructure and Transportation.

PTH 8 & 101 Jacking

PR 250 over the Assiniboine River Repair

Pipestone Creek Acrow Bent
-
PTH 8 & 101 Jacking
Scope: Bridge Jacking
Prairie Iron was contracted to provide Jacking Services for the PTH8 & 101 bridge rehabilitation. Prairie Iron Jacked and cribbed each of the Abutments 12” to be able to provide the General contractor with enough clearance to refurbish the bearings.
General Contractor: Graham Construction and Engineering -
PR 250 over the Assiniboine River Repair
Scope: Emergency Bridge Repair
After an Impact Left 4 columns and multiple top and bottom Chords Damagaed the bridge on PR 250 over the Assiniboine River was shut down to traffic on September 1, 2015. Being a critical time during the harvest season, Prairie Iron’s Emergency Repair Services were mobilized on site September 4 to begin the repair work. Working through the long weekend Prairie Iron began the process of straightening and reinforcing 4 damaged columns, replacing a severely damaged top chord and multiple bottom chords. Parts were fabricated on site to expedite the repair and to ensure proper fit-up. The repairs were completed September 10th and the bridge re-opened the following day.
Customer: Manitoba Infrastructure and Transportation

Ring Road Over Victoria Ave

Roaring River Bridge Erection
PR 274 over Spruce Creek

Before

During

After
PTH 1 Access Road

Before

During

After
-
Before
PTH 2 over the Souris River Flange Straightening

Before